VSK Portland Cement Plants

Country/Region China
City & Province
Cetegories

VSK Portland Cement Plants

The process is divided in 3 parts:
Raw Materials
  1. Raw Mill Section
  2. Kiln Section
  3. Clinker Grinding Section

1. Raw Mill Section :
All the raw materials should be of less than 25 mm size. If the size of the raw material is bigger than 25 mm, It has to be crushed through a crusher and Hammer Mill. All the materials are crushed stored in the storage yards through belt conveyors.
Now, the raw materials are taken as per their required percentage with the help of a weigh belts( Control by PLC ).The measured materials is went to feed belt conveyor and after that shifted to a feed hopper through elevator .The feed of material is controlled with the help if ratchet Feeder/Table feeder.
2. Kiln Section :
From Surge silo the mixed raw materials are taken to Nodulizer with the help of a screw conveyor.Then water is sprayed on the mix (10%) to make nodules with the help of nodulizer. These nodules are fed into the Kiln through feed chute for burning and Fusion. The temperature goes up to 1350OC in the burning zone. The material travels very slowly in the Kiln. All the material get fused here. After passing through the burning zone the material starts cooling slowly. The Clinkerisation starts and the clinker finally comes out of the Kiln.
3. Clinker Grinding Section :
The clinker so obtained is crushed to make its size less than 25 mm. The crushers/Roller crusher are used to crush the clinker. The Gypsum is used as an additive. Both material crushed together and went into feed hoppers through elevator. They are collected through the feeders provided below the feed hoppers. The clinker and gypsum are mixed in certain ratios (5%). So, the weigh belt is used to weigh the ingredients for mixing. A modern electronic weighing & control system may also be used to weigh and measure the ingredients The ratchet/Tables feeder is used to control the feed in the mill and control the fineness of the Cement.
The ground Cement is taken to the aeration and storage silo with the help of elevator or air lift.The aerated Cement is filled in 50Kg bags with the help of packing machine. The product is stored in the godown through belt conveyor and stacking/dispatched as per requirements. The pollution control equipments are necessary as there may be dusting in the plant.

Purchase cheap VSK Portland Cement Plants from manufacturers
Email to this supplier
 
From:
Enter your Email please.
To: Megatech International Private Limited
Subject:
Message:
Characters Remaining: (0/3000)
 

Other Products about VSK Portland Cement Plants

Product Categories

|Home|Products|Suppliers| Site Map| About Us| Contact Us| Help| Privacy Policy| 关于我们| 联系我们| 会员服务|

China Hot Products: A| B| C| D| E| F| G| H| I| J| K| L| M| N| O| P| Q| R| S| T| U| V| W| X| Y| Z| 0~9

Copyright © 2011 chemchinanet.com. All rights reserved.

京ICP备09074326号-4.京公网安备110105008837号